Experienced Concrete Finisher with 7+ years in formwork and finishing. Skilled in bull floats, float finishing, hand tools, and worksite safety, with a strong record of quality surfaces, clean job sites, and reliable teamwork.
Work History
Concrete Finisher
3 Months
Easton Concrete | 07.2026 - Current
Set wood and other forming materials to prepare for concrete pours.
Wore correct clothing and protective equipment for jobs.
Contributed to a positive work environment by maintaining open communication with team members and supervisors on project progress.
Increased client satisfaction by efficiently addressing concerns and providing high-quality finished surfaces.
Inspected completed forms for accuracy, correcting gaps, misalignments, and surface defects.
Increased productivity with proper use of power tools such as circular saws, drills, and pneumatic nailers for efficient assembly of formwork systems.
Concrete Finisher
8 Months
Suntec | 11.2025 - 07.2026
Repaired imperfections by patching, grinding, and resurfacing concrete after initial set
Installed rebar and molded expansion joints and edges for concrete projects.
Adapted quickly to changing job site requirements or unforeseen challenges without compromising quality or exceeding deadlines in completing assigned tasks related to concrete finishing.
Coordinated with crew members to maintain efficient pour schedules and safe work zones
Inspected finished work for accuracy, consistency, and compliance with project standards
Concrete Finisher
2 Years 2 Months
Easton Concrete | 09.2023 - 11.2025
Finished concrete surfaces using hand tools, power trowels, and floats for smooth, level results
Set forms, edges, and joints to match specifications and support proper slab placement
Monitored curing conditions and applied sealers to protect surface quality and durability
Collaborated with team members to ensure smooth transitions between different phases of the concrete placement process.
Maintained clean, safe worksite for team safety and to help keep projects on-track.
Concrete Form Carpenter
4 Years 8 Months
Rock River Construction | 01.2019 - 09.2023
Built concrete forms for foundations, walls, and slabs under the supervision of my foremen
Coordinated with crew members to sequence form installation, reinforcement placement, and pour readiness.
Operated saws, levels, and hand tools safely while maintaining organized work areas and material flow.
Measured, cut, and assembled lumber, plywood, and hardware for precise formwork alignment.
Installed form bracing and supports to maintain stability during concrete placement and curing.