Professional Summary
Overview
Work History
Education
Skills
Certification
Timeline

Keith Eric Bee

Bee's Construction
Libby,Mt
1
Certification
2027
years of professional experience

Long-term career growth with reputable organization is top priority.,Interview Readiness supports strong fit and value discussions.,Reliable machine operation, assembly, and setup deliver productive work output.,Quality-focused Performance supports consistent manufacturing standards.,Mechanical and manufacturing knowledge strengthens efficient operations.,Safety and OSHA certifications support compliant work practices.,Proficiency with hand tools, mechanical tools, saws, and construction equipment supports versatile field readiness.

Work History

Construction Foreman

Bee's Construction | 2017 - Current
  • Managed OSHA compliance activities from 2014–2017.
  • Organized and detail-oriented with a strong work ethic.
  • Supervised daily crew activities, ensuring execution aligned with project plans and safety requirements.
  • Demonstrated versatility in carpentry techniques, working proficiently with both hand tools and power tools to achieve desired results.
  • Supervised carpentry crews to ensure framing, finishing, and punch-list work met project specifications.
  • Coordinated daily work assignments to keep schedules aligned with jobsite priorities and trade sequencing.
  • Monitored material availability and requested lumber, hardware, and finish supplies to avoid delays.
  • Mentored junior carpenters to develop their skills, ensuring a well-trained workforce for future projects.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.

Cabinet Maker

14 Years 9 Months
Riceland Cabinet | 01.2012 - 2017

Cabinet Maker

  • Operated saws, routers, and sanders to produce precise cabinet parts and smooth finished surfaces.
  • Measured materials carefully to ensure proper alignment, fit, and repeatable cabinet construction.
  • Installed hinges, drawer slides, and hardware according to build specifications and quality standards.
  • Inspected completed cabinets for defects, correcting alignment and finish issues before release.
  • Assisted with material preparation and part staging to support efficient production flow.
  • Implemented quality control measures, consistently producing durable and aesthetically pleasing cabinets that met all specifications.

Petroleum Technician

CH2M Hill | 2008 - 2012

Managed petroleum equipment maintenance and repair activities to ensure operational readiness.

  • Calibrated measurement tools and verified equipment performance against specifications.
  • Performed routine maintenance on pumps, valves, meters, and filtration equipment.
  • Documented inspection results, repair actions, and compliance records accurately.
  • Increased equipment reliability through meticulous preventive maintenance procedures.

Assembly Line Production Worker

Pentair Pump | 1998 - 2008
  • Assembled pump components according to work instructions and production specs.
  • Checked parts for defects to support consistent quality during assembly.
  • Used hand tools and power tools to complete repetitive production tasks accurately.
  • Kept workstation clean, organized, and aligned with safety and manufacturing standards.
  • Packed and labeled finished units for shipment and inventory handling.

Education

Hillsdale Highschool | 01-1986
Graduated

Skills

Supported general construction tasks on job sites.
Assisted with basic building construction knowledge and material handling.
Helped with costume assembly and construction tasks.
Supported home construction tasks and site preparation.
Performed preventive maintenance to reduce equipment issues.
Troubleshot equipment and worksite problems quickly.
Used hand tools and power tools safely and correctly.

Certification

OSHA 10 Construction, Oil Field and Production, Rope Access Tech Level, NSCT Training & Hazwoper Operation, Safety in Motion

Timeline

Cabinet Maker

Riceland Cabinet
01.2012 - 2017Read More

Hillsdale Highschool

Read More

Construction Foreman

Bee's Construction
2017 - CurrentRead More

Petroleum Technician

CH2M Hill
2008 - 2012Read More

Assembly Line Production Worker

Pentair Pump
1998 - 2008Read More
Keith Eric Bee