Summary
Overview
Work History
Education
Skills
Certification
Additional Information
Timeline
Generic

Kris John Liggett

Great Falls

Summary

Accomplished construction professional with over 18 years of experience in heavy civil and utility projects, progressing from operator to superintendent. Skilled in managing multimillion-dollar projects, overseeing crews of up to 20, and delivering on-time, within-budget results. Demonstrated estimating expertise by preparing material takeoffs and reviewing quotes using Bluebeam and Excel, contributing to a 36% gross profit on a $10M project. Certified in SWPPP, septic systems, and excavation safety, seeking to leverage field, cost management, and software proficiency as a Project Manager/Estimator.

Overview

19
19
years of professional experience
1
1
Certification

Work History

Foreman/Superintendent

Central Plumbing, Heating, and Excavation
01.2018 - Current
  • Led $10M Weapons Storage Maintenance Facility (WSMF) project at Malmstrom AFB, managing 10-20 employees, coordinating foundation and utility prep, maintaining budgets, and overseeing material logistics, Contributing to a projected 36% gross profit.
  • Assisted project managers in preparing material takeoffs for WSMF project using Bluebeam and Excel, ensuring accurate part and material estimates.
  • Reviewed quotes for WSMF project, identifying errors in pipe quantity estimates and saving $100K in potential overages.
  • Trained foreman and operators on shooting grade, calculating grade percentages, and estimating quantities for concrete, gravel, and other construction materials, improving project accuracy and efficiency.
  • Directed $3M Simms Sewer Lagoon Improvement Project as General Contractor Superintendent, managing 5 subcontractors, constructing new lagoons, and installing irrigation systems.
  • Oversaw $1.5M-$2.5M projects, including MAFB water improvements (30 hydrants, 1,200 ft of pipe bursting), Geraldine sewer upgrades (thousands of feet of pipe, 100+ services), and Les Schwab Marketplace site work.
  • Managed high-risk excavations up to 23 ft deep for Great Falls sanitary and storm sewer projects, ensuring compliance with OSHA and confined space protocols.
  • Improved project efficiency by implementing SWPPP and safety training, reducing downtime and violations.

Equipment Operator

Phillips Construction
01.2012 - 01.2018
  • Contributed to $1M+ infrastructure projects, including Great Falls 2nd and 18th Street water/storm drain upgrades, installing thousands of feet of pipe and 10 ft box culverts at depths up to 23 ft.
  • Operated heavy equipment for Cutbank’s 9,000 ft force main sewer and Harlowton/Conrad water improvement projects, ensuring precise utility installations.
  • Supported Great Falls Memorial Stadium turf remodel and city street reconstructions, enhancing community infrastructure.
  • Maintained equipment and coordinated with crews to meet tight project deadlines.

Operator/Laborer

Liggett Construction
01.2006 - 01.2012
  • Operated equipment for $500K-$1M projects, including Valier and Bootlegger water improvements, installing thousands of feet of 8” pipe, 200+ meter pits, and water towers.
  • Performed site prep and utility installations for Great Falls Sonic Burger and MANG Squadron Operations building, ensuring accurate foundation and utility placement.
  • Installed 50-75 residential water and sewer services in the city of great falls, complying with all city codes and regulations.
  • Supported Holter Lake Lodge demolition and MANG munitions projects, gaining early experience in labor and equipment operation.

Education

High School Diploma -

C.M. Russell High School
Great Falls, MT
01.2007

Skills

  • Project Management
  • Scheduling
  • Budget Oversight
  • Subcontractor Coordination
  • Estimating
  • Material Takeoffs
  • Quote Review
  • Cost Analysis
  • Grade Calculations
  • Technical
  • Heavy Equipment Operation
  • Utility Installation
  • Site Preparation
  • Grade Shooting
  • Safety
  • OSHA Compliance
  • SWPPP Administration
  • Confined Space Rescue
  • Activity Hazard Analysis
  • Software
  • Bluebeam
  • Microsoft Excel
  • AutoDesk
  • Leadership
  • Crew Training
  • Stakeholder Communication
  • Problem-Solving

Certification

  • Certified Septic System Installer
  • Certified SWPPP Preparer and Administrator, Montana
  • Excavation Safety Training
  • Reasonable Suspicion Safety Training
  • OSHA 10 Training
  • Confined Space Training
  • Confined Space Rescue Training
  • Certified Rigging Training

Additional Information

Most Improved Activity Hazard Analysis Award, Walsh, Fall 2023 (led crew to $500 gift card recognition)

Timeline

Foreman/Superintendent

Central Plumbing, Heating, and Excavation
01.2018 - Current

Equipment Operator

Phillips Construction
01.2012 - 01.2018

Operator/Laborer

Liggett Construction
01.2006 - 01.2012

High School Diploma -

C.M. Russell High School
Kris John Liggett